At the “Miziya” limestone deposit, the concessionaire BULSTONE Ltd. has entrusted our team with the full engineering and geological support of the operation over the years. This includes the preparation of annual mining projects, geological reports, mine surveying measurements, and all required technical documentation under the granted concession.
The work ensures proper mine planning, reserve control, and full compliance with concession terms and applicable regulations.